Plant Infrastructure
Manufacturing Area – Hormones / Steroids
TWO SEPRATE BLOCKS OF MANUFACTURING FOR HORMONES & STEROIDS
- Glass Line Reactor of 630 Lt capacity
-
SS Reactors ranging from 0.35 KL to 1.25 KL
-
Clean Room Area of Class 1,00,000
-
From gram to Kilo Level Capacity Manufacturing Area
-
ANFD (Agitated Nutsche Filter Dryer)
-
Air Mist Shower
-
HEPA Filters of 0.3 micron in Powder processing Area
-
Provision of BIBO (Bag in bag out) filters
-
Rota cone Vacuum Dryer
-
Large Rooms and Corridors for easy man and material movement
-
Mfg. area is designed, constructed, adapted and maintained to suit the manufacturing operations so as to permit production of drugs under hygienic conditions.
-
Dedicated Micronization Area
-
Total 3 Clean Room Areas
-
Glass Assembly from 50 Lts. to 200 Lts. for Small Volume Products
Quality Control Laboratory
List of Major Instruments:
-
* HPLC System from Shimadzu
-
* GC with Head Space and Auto Sampler & PDA Detector
-
* UV Spectrophotometer
-
* FTIR
-
* Polarimeter
-
* Karl Fischer
-
* Micro Balance
-
* Potentiometer
- Biosafety Cabinet
-
IR Moisture Balance
- Elga Water Purification system
(Note: * All Equipment’s are 21 CFR Complaint)
List of Major Instruments in Microbiology Lab:
Fully Independent In-house Microbiology lab. with,
- BOD Incubator
- Bacteriological Incubator
- Laminar Air Flow
- Autoclave (*Horizontal & Vertical)
-
* TOC Analyzer (Shimadzu)
- Microscope
- Colony Counter
- Biosafety Cabinet
(Note: * All Equipment’s are 21 CFR Complaint)
Effluent Treatment Plant (ETP)
- Well Equipped ETP Plant with Primary, Secondary and Tertiary Treatment to achieve Latest Statutory Guidelines.
- Multiple Effect Evaporator to treat high COD Effluent.
- Kill pots provided to neutralize the drug potency with sodium hypochloride.
- ETP Plant is well equipped to achieve Zero Liquid Discharge.
EHS Program
- Ensuring Personnel Safety is of priority.
- Effective Safety & EHS Training.
- Personal Protective Equipment made available.
- Effective Fire Hydrant System with Site-Emergency Plan
- Situated less than 1 km away from the Government Hospital
- 500 Kva Back-up Diesel Generator connected to all Key Equipment’s to ensure minimal down time.
Quality Assurance
- Validation Master Plan
- Equipment qualification
- Process validation
- Cleaning validation
- HVAC validation
- Water system validation
- Analytical validation
- Change Control, Deviation, OOS Management
- Effective GMP Training to all Employees
- Periodic Internal Audits